<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://reports-public-sandbox.ieso.ca/docrefs/stylesheet/PredispTotals_HTML_t1-1.xsl" ?>
<Document docID="PredispTotals" xmlns="http://www.ieso.ca/schema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.ieso.ca/schema https://reports-public-sandbox.ieso.ca/docrefs/schema/PredispTotals_r1.xsd">
<DocHeader>
<DocTitle>Predispatch Totals Report</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-06-16T20:18:36</CreatedAt>
</DocHeader>
<DocBody>
<DeliveryDate>2026-06-17</DeliveryDate>
<Energies>
<HourlyConstrainedEnergy>
<DeliveryHour>1</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>14385</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>381.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>14003.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>680.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>652.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>292.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>2</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>14040.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>349.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>13690.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>679.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>652.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>292.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>3</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>13742.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>338.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>13403.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>680.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>652.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>292.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>4</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>13909.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>341.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>13568.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>679.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>626.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>318.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>5</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>14216.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>345.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>13871.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>666.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>278.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>6</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15385.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>396.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>14989.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>724.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>729.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>174.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>7</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15906.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>409.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15497.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>722.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>485.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>209.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>82.7</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>8</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16082.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>412.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15670.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>471.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>264.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>174.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>9</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15874.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>402.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15472.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>634.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>120.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>10</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16312.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>415.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15897.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>627.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>11</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16413.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>415.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15997.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>630.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>12</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16540</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>419.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16120.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>627.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>120.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>13</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16609.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>424.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16185.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>626.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>14</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17006.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>419.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16586.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>624.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>72.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>69.2</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>15</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16539.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>414.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16124.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>626.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>72.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>16</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16478.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>415.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16063.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>623.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>90.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>72.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>17</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16262.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>399.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15863.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1010.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>72.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>18</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16508.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>401.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16107.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>955.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>72.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>19</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16035.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>390.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15645.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>958.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>76.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>20</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15877.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>408.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15469.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>960.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>76.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>140.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>21</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16634.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>413.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16221.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>962.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>22</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16841.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>428.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16413.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>632.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>78.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>23</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16090.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>433.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15656.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>470.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>693.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>174.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>100.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>24</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>14886.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>414.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>14471.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>671.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>273.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
</Energies>
</DocBody>
</Document>