<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://reports-public-sandbox.ieso.ca/docrefs/stylesheet/PredispTotals_HTML_t1-1.xsl" ?>
<Document docID="PredispTotals" xmlns="http://www.ieso.ca/schema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.ieso.ca/schema https://reports-public-sandbox.ieso.ca/docrefs/schema/PredispTotals_r1.xsd">
<DocHeader>
<DocTitle>Predispatch Totals Report</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-07-30T11:09:16</CreatedAt>
</DocHeader>
<DocBody>
<DeliveryDate>2026-07-30</DeliveryDate>
<Energies>
<HourlyConstrainedEnergy>
<DeliveryHour>1</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15892</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>424.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15467.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>444.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>500.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>213.8</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>2</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15590.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>411.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15179.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>720.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>433.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>512.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>288.6</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>3</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15463.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>402.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15060.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>523.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>421.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>426.3</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>4</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15300.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>399.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>14900.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>720.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>444.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>500.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>469.6</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>5</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15665.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>411.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15253.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>484.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>460.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>6</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16712.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>440.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16272.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>854.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>238.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>73.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>7</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17427.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>438.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16989.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>956.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>8</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17177.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>454.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16723.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>701.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>9</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17065</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>450.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16614.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>6.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>10</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17322.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>471.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16851.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>11</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17186.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>463.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16722.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>94.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>12</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17235.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>462.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16772.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>66.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>13</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17226.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>462.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16764.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>122.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>14</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18016</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>486.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17529.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>698.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>15</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17406.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>484.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16922.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>93.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>16</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17533.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>479.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17054.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>92.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>85.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>67.8</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>17</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17719.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>479.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17239.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1083.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>72.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>18</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17807.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>479.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17328.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1080.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>148.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>19</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17561.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>484.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17077.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1083.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>137.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>20</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17676.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>482.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17194.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1085.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>113.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>21</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17695.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>483.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17211.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1087.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>111.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>22</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17570.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>486.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17084.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>702.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>130.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>23</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17515.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>510.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17005.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>16.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>24</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17080.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>536.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16544.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>958.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>147.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
</Energies>
</DocBody>
</Document>