<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://reports-public-sandbox.ieso.ca/docrefs/stylesheet/PredispTotals_HTML_t1-1.xsl" ?>
<Document docID="PredispTotals" xmlns="http://www.ieso.ca/schema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.ieso.ca/schema https://reports-public-sandbox.ieso.ca/docrefs/schema/PredispTotals_r1.xsd">
<DocHeader>
<DocTitle>Predispatch Totals Report</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-07-30T03:12:27</CreatedAt>
</DocHeader>
<DocBody>
<DeliveryDate>2026-07-30</DeliveryDate>
<Energies>
<HourlyConstrainedEnergy>
<DeliveryHour>1</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15892</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>424.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15467.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>444.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>500.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>213.8</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>2</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15590.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>411.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15179.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>720.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>433.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>512.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>288.6</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>3</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15463.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>402.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15060.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>523.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>421.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>426.3</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>4</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15300.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>399.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>14900.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>720.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>444.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>500.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>469.6</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>5</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>15665.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>411.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15253.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>484.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>460.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>473.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>6</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16832.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>442.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16389.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>724.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>533.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>291.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>7</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17636.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>492.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17143.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>868.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>124.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>8</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17558.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>486.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17072.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>701.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>9</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17426.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>477.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16949.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>10</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17809</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>493.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17315.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>11</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17781.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>495.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17286.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>12</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17852.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>495.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17356.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>6.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>13</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17805.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>496.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17309.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>58.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>14</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18075.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>485.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17590.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>698.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>15</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17573.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>485.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17088.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>94.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>16</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17723.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>481.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17241.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>92.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>85.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>67.1</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>17</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17491.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>490.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17001.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1083.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>46.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>18</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17655.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>492.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17163.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1080.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>138.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>19</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17494.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>475.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17018.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1083.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>131.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>20</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17620.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>474.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17145.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1085.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>122.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>21</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17649.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>474.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17175.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1087.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>103.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>22</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17582.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>475.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17106.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>702.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>113.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>23</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17439</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>480.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16958.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>121.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>24</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16887</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>489.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16397.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>853.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>282.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>136.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
</Energies>
</DocBody>
</Document>