<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://reports-public-sandbox.ieso.ca/docrefs/stylesheet/PredispTotals_HTML_t1-1.xsl" ?>
<Document docID="PredispTotals" xmlns="http://www.ieso.ca/schema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.ieso.ca/schema https://reports-public-sandbox.ieso.ca/docrefs/schema/PredispTotals_r1.xsd">
<DocHeader>
<DocTitle>Predispatch Totals Report</DocTitle>
<DocRevision>1</DocRevision>
<DocConfidentiality>
<DocConfClass>PUB</DocConfClass>
</DocConfidentiality>
<CreatedAt>2026-08-10T02:11:23</CreatedAt>
</DocHeader>
<DocBody>
<DeliveryDate>2026-08-10</DeliveryDate>
<Energies>
<HourlyConstrainedEnergy>
<DeliveryHour>1</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16447.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>441.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16005.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>956.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>93.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>82.9</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>2</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16285.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>436.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15849.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>840.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>338.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>274.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>3</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16361.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>425.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15936.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>721.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>400.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>266.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>4</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16034.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>416.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>15617.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>790.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>328.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>485.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>5</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>16864.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>446.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16418.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>731.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>411.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>534.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>152.2</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>6</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17509.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>474.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17034.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>955.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>27.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>7</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17829</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>485.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17343.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>956.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>8</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18080.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>500.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17580.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>701.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>9</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17491.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>476.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17015.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>120.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>4.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>10</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17798.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>508.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17290.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>104.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>11</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17800.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>505.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17295.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>12</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17735.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>503.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17231.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>120.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>52.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>13</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17789.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>509.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17279.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>35.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>14</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18210.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>501.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17709.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>698.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>7.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>15</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17414.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>488.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16925.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>700.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>138.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>16</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17677.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>494.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17183.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>697.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>90.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>85.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>59.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>17</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17731.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>491.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17240.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1083.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>49.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>18</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17778.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>498.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17279.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1080.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>141.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>19</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17714.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>489.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17225.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1083.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>55.3</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>20</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>18106.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>489.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17617.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1085.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>148.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>21</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17599.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>519.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17080.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>1087.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>98.6</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>22</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17712.1</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>485.4</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17226.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>702.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>115.7</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>23</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17543.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>477.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>17065.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>704.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>9.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
<HourlyConstrainedEnergy>
<DeliveryHour>24</DeliveryHour>
<MQ>
<MarketQuantity>Total Energy</MarketQuantity>
<EnergyMW>17177</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Loss</MarketQuantity>
<EnergyMW>479.2</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Load</MarketQuantity>
<EnergyMW>16697.8</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total Dispatchable Load Scheduled OFF</MarketQuantity>
<EnergyMW>958.9</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10S</MarketQuantity>
<EnergyMW>150.0</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 10N</MarketQuantity>
<EnergyMW>43.5</EnergyMW>
</MQ>
<MQ>
<MarketQuantity>Total 30R</MarketQuantity>
<EnergyMW>.0</EnergyMW>
</MQ>
</HourlyConstrainedEnergy>
</Energies>
</DocBody>
</Document>